Where Power Projects Are Waiting to Connect
Capacity of generation and storage projects active in interconnection queues at year end, by grid operator, gigawatts
Latest reading for each area, to 2025 · Bins hold about equal counts
Plays the chart through its history, period by period.
Lawrence Berkeley National Laboratory and GridTracker, Queued Up (CC BY 4.0). Capacity of generation and storage projects still active in interconnection queues at year end. Most queued capacity is never built. Each state takes the colour of the grid operator that covers most of it; the Southeast and the West outside California are utilities that sit outside an ISO.
Proposed power plants and batteries in each grid operator’s queue. The largest queues are where developers expect demand and where land and sun are cheap; how fast each operator clears its queue decides how much of it gets built.
Ranked, 9 areas
| # | Covers | |||
|---|---|---|---|---|
| 1 | Western utilities outside an ISO | WA, OR, ID, MT, WY, UT, NV, CO, AZ, NM | 567 | 2025 |
| 2 | ERCOT (Texas) | TX | 408 | 2025 |
| 3 | MISO (Midcontinent) | MN, WI, IA, IL, MI, IN, MO, AR, LA, MS | 382 | 2025 |
| 4 | CAISO (California) | CA | 191 | 2025 |
| 5 | SPP (Southwest Power Pool) | KS, OK, NE, ND, SD | 171 | 2025 |
| 6 | Southeast utilities outside an ISO | GA, AL, FL, NC, SC, TN, KY | 153 | 2025 |
| 7 | PJM (Mid-Atlantic and Ohio Valley) | PA, NJ, MD, DE, DC, VA, WV, OH | 144 | 2025 |
| 8 | NYISO (New York) | NY | 29 | 2025 |
| 9 | ISO New England | ME, NH, VT, MA, RI, CT | 15 | 2025 |
What this chart reads·9 series
Show allHide
- CAISO (California) Interconnection Queue, Active Capacity (GW)as “CAISO (California)”latest 2025-12-31
- ERCOT (Texas) Interconnection Queue, Active Capacity (GW)as “ERCOT (Texas)”latest 2025-12-31
- ISO New England Interconnection Queue, Active Capacity (GW)as “ISO New England”latest 2025-12-31
- MISO (Midcontinent) Interconnection Queue, Active Capacity (GW)as “MISO (Midcontinent)”latest 2025-12-31
- NYISO (New York) Interconnection Queue, Active Capacity (GW)as “NYISO (New York)”latest 2025-12-31
- PJM (Mid-Atlantic and Ohio Valley) Interconnection Queue, Active Capacity (GW)as “PJM (Mid-Atlantic and Ohio Valley)”latest 2025-12-31
- SPP (Southwest Power Pool) Interconnection Queue, Active Capacity (GW)as “SPP (Southwest Power Pool)”latest 2025-12-31
- Southeast utilities outside an ISO Interconnection Queue, Active Capacity (GW)as “Southeast utilities outside an ISO”latest 2025-12-31
- Western utilities outside an ISO Interconnection Queue, Active Capacity (GW)as “Western utilities outside an ISO”latest 2025-12-31
Sources·9 sources
Show allHide
CAISO (California) Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
ERCOT (Texas) Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
ISO New England Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
MISO (Midcontinent) Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
NYISO (New York) Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
PJM (Mid-Atlantic and Ohio Valley) Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
SPP (Southwest Power Pool) Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
Southeast utilities outside an ISO Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
Western utilities outside an ISO Interconnection Queue, Active Capacity (GW). Source: Lawrence Berkeley National Laboratory and GridTracker, "Queued Up: 2026 Edition" data file (emp.lbl.gov/queues), tab "09. Active Cap. Region+Type". Licensed CC BY 4.0: "You may use, share, or adapt the dataset as long as you attribute it to Lawrence Berkeley National Laboratory and GridTracker." Updated once a year when LBNL publishes a new edition.
Charts are drawn from Palanor's signal library and recomputed from source data on every view. Transformations (changes, indexing, year-on-year rates) are Palanor's.