Skip to content
Palanor is in early release, with our founding customers.Become a founding customer →
PalanorPalanor

Stacked area

Planned U.S. Generating Capacity, Next 12 Months

Nameplate capacity developers plan to bring online in the 12 months after each monthly report, by technology, gigawatts

Total 83.8 in Aug 2026+21.9 since Aug 2024
Reading overdue·Data to Aug 2026

Plays the chart through its history. Pauses are where the data set a record or moved most.

EIA Form 860M, nameplate capacity of plants of 1 MW or more in the 50 states and DC. Rooftop solar is not included. Each point is one monthly report’s planned generators due in the following 12 months, at any stage from planned to testing. Planned dates slip and some projects are cancelled.

The near-term pipeline of new U.S. power plants, as developers report it to EIA each month. It is the most current public read of how much new supply is on the way for the data centers and factories waiting on the grid.

What this chart reads·6 series

Show all

Sources·6 sources

Show all

U.S. Planned Solar Capacity, Next 12 Months (GW). Source: U.S. Energy Information Administration, Form EIA-860M, Preliminary Monthly Electric Generator Inventory (eia.gov/electricity/data/eia860m). Public domain. Refreshed weekly.

U.S. Planned Wind Capacity, Next 12 Months (GW). Source: U.S. Energy Information Administration, Form EIA-860M, Preliminary Monthly Electric Generator Inventory (eia.gov/electricity/data/eia860m). Public domain. Refreshed weekly.

U.S. Battery Storage Planned Additions, Next 12 Months. Source: U.S. Energy Information Administration, Form EIA-860M Preliminary Monthly Electric Generator Inventory, Planned sheet (eia.gov/electricity/data/eia860m). EIA data are in the public domain.

U.S. Planned Natural Gas Capacity, Next 12 Months (GW). Source: U.S. Energy Information Administration, Form EIA-860M, Preliminary Monthly Electric Generator Inventory (eia.gov/electricity/data/eia860m). Public domain. Refreshed weekly.

U.S. Planned Nuclear Capacity, Next 12 Months (GW). Source: U.S. Energy Information Administration, Form EIA-860M, Preliminary Monthly Electric Generator Inventory (eia.gov/electricity/data/eia860m). Public domain. Refreshed weekly.

U.S. Planned Other Capacity, Next 12 Months (GW). Source: U.S. Energy Information Administration, Form EIA-860M, Preliminary Monthly Electric Generator Inventory (eia.gov/electricity/data/eia860m). Public domain. Refreshed weekly.

Charts are drawn from Palanor's signal library and recomputed from source data on every view. Transformations (changes, indexing, year-on-year rates) are Palanor's.

Related charts

EnergyForecast

U.S. Battery Storage: Operating vs. Planned

Utility-scale battery capacity operating, and capacity developers plan to bring online over the next 12 months, nameplate gigawatts

53.2Data to Aug 2026
EnergyForecast

U.S. Gasoline and Diesel Prices

Average U.S. retail price per gallon, $

$4.28Data 4 days ago
EnergyForecast

ERCOT Daily Peak Demand

Highest hourly system-wide ERCOT load for each operating day, megawatts.

63,001Data 2 days ago
EnergyForecast

Gulf Coast Jet Fuel Since the End of February

U.S. Gulf Coast kerosene-type jet fuel, wholesale spot price, $ per gallon, weekly, from the last price before February 28, 2026

$4.50Data 7 days ago
EnergyForecast

Extra Fuel Cost per U.S. Household Since February 28

Running total of the extra cost of gasoline and diesel per household since February 28, 2026, household-weighted average of the states, weekly, $

$754Data 4 days ago
EnergyForecast

Crude Oil Price

West Texas Intermediate crude oil spot price, $ per barrel

$99.97Data 3 days ago

Cookies

We only use essential cookies to keep you signed in and remember your theme. No analytics, no tracking, no ads. See the Privacy Policy for the full read.